Cabled Cravat
Knitting

ABBREVIATIONS:

K = knit p = purl st(s) = stitch(es) RS = right side
WS = wrong side YO = yarn over k2tog = knit 2 sts together psso = pass the slipped st over

Size:

1 Size fits most adults

Materials:

Name

 

Weight

Gauge
10 cm
Aig. Metres Gramm
M R
Plymouth yarn
Baby Alpaca Grande
100% Alpaga Chunky
12 -- 6.5 mm
10.5 US
101 100

1 hank Baby Alpaca Grande

Needles:

Size 10.5, cable needle

Gauge:

12 sts = 4” in st st

C4B:

Slip 2 sts onto cable needle and hold to the back, knit two sts from left needle then knit 2 sts from cable needle.

C4F:

Slip 2 sts onto cable needle and hold to the front, knit two sts from left needle then knit 2 sts from cable needle.

T3L:

Slip 2 sts onto cable needle and hold to the front, purl one st from left needle then knit 2 sts from cable needle.

T3R:

Slip 1 st onto cable needle and hold to the back, knit two sts from left needle then purl 1 st from cable needle.

 

Loosely cast on 22 sts.

Beginning Cables:

Row 1: (K2, p2) five times, k2.

Row 2: (P2, k2) five times, p2.

Row 3: Repeat row 1.

Row 4: Repeat row 2.

Row 5: K2, p2, (T3L, T3R, p2) twice, k2.

Row 6: P2, k3, p4, k4, p4, k3, p2.

Row 7: K2, p3, C4B, p4, C4F, p3, k2.

Row 8: Repeat row 6.

Row 9: K2, p2, (T3R, T3L, p2) twice, k2.

Row 10: Repeat row 2.

Row 11: K2, p1, (T3R, p2, T3L) twice, p1, k2.

Row 12: P2, k1, p2, k4, p4, k4, p2, k1, p2.

Row 13: K2, p1, k2, p4, C4B, p4, k2, p1, k2.

Row 14: Repeat row 12.

Row 15: K2, p1, (T3L, p2, T3R) twice, p1, k2.

Row 16: Repeat row 2.

Row 17: Repeat row 5.

Row 18: Repeat row 6.

Row 19: Repeat row 7.

Row 20: Repeat row 6.

Row 21: Repeat row 9.

Row 22: Repeat row 2.

Body of Cravat:

Row 1: (K2, p2) five times, k2.

Row 2: (P2, k2) five times, p2.

Repeat rows 1 and 2 until cravat reaches 21” total.

Opening:

The opening is formed by dividing the stitches in half and working them individually then joining them back together.

Row 1: (K2, p2) twice, T3L, T3R, (p2, k2) twice.

Row 2: P2, k2, p2, k3, p4, k3, p2, k2, p2.

Row 3: K2, p2, k2, p3, C4B, p3, k2, p2, k2.

Row 4: Repeat row 2.

Row 5: (K2, p2) twice, T3R, T3L, (p2, k2) twice.

Row 6: (P2, k2) five times, p2.

Row 7: (K2, p2) twice, k2, p1, TURN.

Only 11 stitches have been worked.

Row 8: K1, (p2, k2) twice, p2 TURN.

Repeat rows 7 and 8 four more times.

Then (K2, p2) twice, k2, p1. DO NOT turn.

Cut yarn.

Reattach yarn to begin working the second 11 sts.

Continuing on the right side with yarn reattached:

P1, (k2, p2) twice, k2, TURN.

Row 1: (WS) (P2, k2) twice, p2, k1, TURN.

Row 2: (RS) P1, (k2, p2) twice, k2, TURN.

Repeat these two rows four more times.

Joining the two pieces together again:

WS: (P2, k2) five times, p2. Make sure to pull the yarn a little tighter over the gap.

Ending Cables:

Row 1: (K2, p2) five times, k2.

Row 2: (P2, k2) five times, p2.

Row 3: (K2, p2) twice, T3L, T3R, (p2, k2) twice.

Row 4: P2, k2, p2, k3, p4, k3, p2, k2, p2.

Row 5: K2, p2, k2, p3, C4B, p3, k2, p2, k2.

Row 6: Repeat row 4.

Row 7: (K2, p2) twice, T3R, T3L, (p2, k2) twice

Row 8: Repeat row 2.

Row 9: K2, p2, (T3L, T3R, p2) twice, k2.

Row 10: P2, k3, p4, k4, p4, k3, p2.

Row 11: K2, p3, C4B, p4, C4F, p3, k2.

Row 12: Repeat row 10.

Row 13: K2, p2, (T3R, T3L, p2) twice, k2.

Row 14: Repeat row 2.

Row 15: Repeat row 1.

Row 16: Repeat row 2.

Bind off.

Weave in ends.

 

 

 

 

 

 

 

Recherche personnalisée